Skip to main content

Repair shop invoice template

An invoice built for motor and rewind work, itemized labor, parts, outside services, core credits, and the reference fields that stop industrial customers from short-paying you. Free to copy, no sign-up.

Getting paid faster

See how invoices generated from the approved work order cut the disputes this template is designed to prevent.

Book a free 30-min demo

We'll follow up to help you get listed and onboarded. Prefer email? Contact page.

A repair shop invoice has a harder job than a retail one. It has to survive an industrial accounts payable department that will match it against a purchase order, an approved quote, and a receiving note before anyone signs a cheque. Miss the PO number and it sits in a queue. Exceed the approved amount without documented authorization and it gets short-paid. Bill “motor repair — $4,200” as one line and purchasing calls you instead of paying you.

The template below is structured to clear those hurdles: full reference block, itemized labor and parts, separate lines for the outside services and freight that shops routinely absorb by accident, and a test-results summary that quietly ends most quality disputes. It pairs with the motor repair work order template — same job number, same equipment block, so the invoice reconciles to what was authorized.

The template, field by field

1. Your details

Boring, and the reason invoices get returned. Accounts payable cannot pay an entity it cannot match to its vendor master.

FieldWhat goes in itRequired
Legal business nameThe name on your vendor registration, not your trading name if they differ.Yes
Address & contactRemit-to address plus a phone number and email for billing queries.Yes
Tax ID / registrationEIN, VAT, GST, or local equivalent. Required in most jurisdictions for the customer to claim the expense.Yes
Invoice numberSequential and unique. Gaps and reused numbers cause audit problems.Yes
Invoice date & due dateState both. "Net 30" alone leaves the due date open to interpretation.Yes

2. Customer & job reference

This block is what a plant's AP clerk matches against their system. Every missing field here is a week of delay.

FieldWhat goes in itRequired
Bill-to entityThe legal entity that issued the PO, often a different company than the plant that shipped you the motor.Yes
Ship-to / siteWhere the repaired unit went, if different from bill-to.Yes
Customer PO numberThe single most common reason industrial invoices are rejected. Get it at intake.Yes
Job / work order numberThe same number as your work order, so the customer can tie the invoice to what they approved.Yes
Equipment identifiedManufacturer, HP/kW, frame, and serial number. Never bill "one motor repaired."Yes

3. Labor

FieldWhat goes in itRequired
Operation descriptionStrip and clean, rewind, machining, bearing replacement, balance, assembly, testing, one line each.Yes
HoursActual hours by operation, from the work order.Yes
RateYour shop rate. Show straight-time and overtime or field-service rates separately if they differ.Yes
Line totalHours multiplied by rate, per operation.Yes

4. Parts & materials

FieldWhat goes in itRequired
Part number & descriptionBearings, seals, magnet wire, insulation, varnish, hardware.Yes
Quantity & unit priceSelling price, not your cost. Consumables can be grouped as one shop-materials line.Yes
Line totalExtended price per line.Yes

5. Other charges

The lines shops forget to bill. Each one is money already spent.

FieldWhat goes in itRequired
Outside servicesMachining, dynamic balancing, plating, specialist testing sent out to a vendor.Optional
Freight in / outInbound collection and outbound delivery, listed separately from the repair.Optional
Rigging / crane / field laborSite work, removal, and reinstallation, with travel time and mileage.Optional
Core charge / scrap creditA credit line if you retained the old core or salvage.Optional
Inspection feeWhere a motor was stripped and quoted but the customer declined the repair.Optional
StorageFor units left past your stated collection window. Only bill it if the term was disclosed.Optional

6. Totals, terms & payment

FieldWhat goes in itRequired
Subtotal, tax, total dueShow the tax rate applied, and mark any exempt lines with the exemption reference.Yes
Deposit / progress paymentsAmounts already received, deducted to give the true balance.Yes
Payment termsNet 30, net 15, COD. Must match what was on the quote and work order.Yes
Late fee policyA stated monthly percentage. Unstated late fees are unenforceable in practice.Optional
How to payBank details, cheque payee, or card link. Make it impossible to have to ask.Yes
Warranty statementDuration and coverage, repeated from the work order.Yes
Test results summaryBefore-and-after insulation resistance and the no-load run figures. Optional, and the single best anti-dispute field on the page.Optional

Plain-text version

Paste this into Word, Google Docs, or a spreadsheet and print it. Nothing to download, no sign-up.

INVOICE

[Your legal business name]
[Street, city, postcode]        Tax ID / EIN: ______________
Billing contact: ____________   Phone: _____________________

Invoice No: ______________      Invoice date: ______________
                                Due date:     ______________

BILL TO                          SHIP TO / SITE
_______________________          _______________________
_______________________          _______________________
_______________________          _______________________

Customer PO: ______________     Job / WO No: ______________
Equipment: ______ HP  Frame ______  Serial ________________
Manufacturer: _____________________________________________

--- LABOR --------------------------------------------------
Description                       Hours    Rate      Amount
Strip, clean & inspect            _____   ______    _______
Rewind                            _____   ______    _______
Machining / bearing fits          _____   ______    _______
Assembly & balance                _____   ______    _______
Final testing                     _____   ______    _______
                                        Labor total  _______

--- PARTS & MATERIALS --------------------------------------
Part no.      Description         Qty   Unit       Amount
__________    ________________   ____   ______    _______
__________    ________________   ____   ______    _______
                                        Parts total  _______

--- OTHER CHARGES ------------------------------------------
Outside services: _________________________       _______
Freight in / out                                  _______
Rigging / field labor                             _______
Core charge / scrap credit                       (_______)
                                        Other total  _______

--- TOTALS -------------------------------------------------
                                 Subtotal          _______
                                 Tax  ______ %     _______
                                 Less deposit     (_______)
                                 TOTAL DUE         _______

Terms: Net ______ days.  Late fee ______ % per month.
Warranty: ______ months covering ___________________________

Test results:  Incoming IR ______ Mohm  ->  Final ______ Mohm
No-load run:  U ______  V ______  W ______ amps

Remit to: __________________________________________________
Bank / account: ____________________________________________
Questions about this invoice: ______________________________

Four billing lines shops forget, every month

Outside services. A rotor goes out for dynamic balancing, the vendor invoice arrives two weeks later, and by then the customer invoice has already gone. The cost sits in overhead permanently. Put the line on the invoice template so it has to be answered, even if the answer is zero.

Freight.Collecting a 400 kg motor is not free, and shops swallow it to seem accommodating. Bill it as a visible line and let the customer decide whether to arrange their own transport.

Inspection fees on declined repairs.Stripping and testing a motor takes real hours. When the customer decides to buy new instead, those hours are still yours to bill — provided the teardown authorization said so up front.

Deposits actually received. Forgetting to deduct a deposit is the one error that gets noticed immediately, and it costs you credibility on every other line of the invoice.

When retyping invoices becomes the problem

Every field in this template already exists on the work order. Typing it a second time is how the invoice total drifts from the approved amount, how a serial number gets a digit wrong, and how parts issued to a job never make it onto the bill at all. The failure is not carelessness; it is that manual re-entry has a predictable error rate and rewind shops run too many jobs for it to stay small.

Generating the invoice from the approved work order removes the step entirely, which is what motor repair invoicing and quoting software is for, sitting on the same job record as the rest of the shop management system. Until then, this template will do the job perfectly well — use it, and switch when the retyping starts costing more than it saves.

Frequently asked questions

What should a repair shop invoice include?
Your details and tax registration, the customer's billing entity and PO number, the job number that matches the work order, the equipment identified by serial number, itemized labor and parts, any outside services and freight, tax, payment terms, and how to pay. For motor work, adding the before-and-after test readings to the invoice measurably reduces disputes.
Should I itemize labor and parts separately on a repair invoice?
Yes for industrial customers, most plants require itemization to process the payment at all, and a lump sum invites a call from purchasing that delays payment by weeks. The exception is a fixed-price quote the customer already approved, where you invoice the agreed total and attach the itemized detail as backup.
What payment terms do motor repair shops normally use?
Net 30 is the industrial default. Shops commonly use 50% deposit on rewinds over a threshold amount, net 15 or COD for new accounts, and a stated late-fee percentage. The important part is that the terms appear on the quote, the work order, and the invoice, terms that first appear at billing are the ones that get argued about.
Why do repair invoices get short-paid?
Almost always a missing PO number, a total that exceeds the approved not-to-exceed amount without a documented change approval, or line items the plant cannot match to what they authorized. All three are paperwork failures upstream of billing, which is why the invoice should be generated from the approved work order rather than typed fresh.