Skip to main content

Motor repair work order template

A work order built for electric motor and rewind shops, nameplate data, incoming test readings, and a two-stage approval line, because you cannot price a rewind before the core is open. Free to copy, no sign-up.

Tired of retyping this?

See how the same fields work when the work order is generated from the quote instead of typed out per job.

Book a free 30-min demo

We'll follow up to help you get listed and onboarded. Prefer email? Contact page.

Most work order templates you find online are generic repair-order forms with a box for “description of work.” They do not survive contact with a motor shop. A rewind job needs nameplate data captured before the plate is cleaned off, incoming megohm and winding-resistance readings recorded as numbers rather than a checkmark, and an authorization structure that admits you cannot quote the repair until you have stripped the core.

The template below is organized the way the job actually moves: intake, nameplate, incoming tests, authorization, work performed, parts, final test, release. Use the field tables to understand what belongs in each box, then copy the plain-text version and make it yours. If you also need the billing side, there is a matching repair shop invoice template.

The template, field by field

1. Header | who, what, when

This block is what everyone quotes back at you on the phone. Keep the job number the same across the quote, the work order, and the invoice.

FieldWhat goes in itRequired
Job / WO numberOne number that follows this motor from intake to invoice. Do not issue a separate quote number and WO number.Yes
Date receivedThe day the motor physically arrived, not the day paperwork was opened. Lead-time promises are measured from here.Yes
CustomerCompany, site, and the person who can approve money, not just the driver who dropped it off.Yes
Customer PO numberMany plants will not pay an invoice without it. Capture it at intake or you will chase it at billing.Yes
Promised / target dateThe date you told the customer. Keep it visible on the floor copy so it drives sequencing.Yes
PriorityStandard, rush, or emergency/breakdown. Drives overtime and outside-service decisions.Optional

2. Motor nameplate data

Copy this off the plate at intake, before anything is cleaned or the plate goes missing. Half of all rewind disputes trace back to a nameplate nobody recorded.

FieldWhat goes in itRequired
Manufacturer & modelExactly as stamped. Note if the plate is illegible or absent.Yes
Serial numberYour proof that the motor you shipped is the motor you received.Yes
HP / kWRated output. Drives coil data, test values, and price band.Yes
Volts / amps / phase / HzFull electrical rating. Note dual-voltage and connection type.Yes
RPM & polesSynchronous speed and pole count for winding data.Yes
Frame size & mountingNEMA/IEC frame, foot or flange, shaft dimensions.Yes
EnclosureTEFC, ODP, TENV, explosion-proof. Explosion-proof changes what repairs are legal.Yes
Insulation class & service factorDetermines materials and acceptable temperature rise.Optional
Bearing numbers (DE / ODE)Drive-end and opposite-drive-end. Record even if you are not replacing them.Yes
AccessoriesEncoder, brake, blower, RTDs, thermistors, space heaters, anything that comes back on the motor.Optional

3. Incoming inspection & test readings

These readings are your evidence. Take them before teardown, record the actual numbers, and note the instrument and ambient conditions.

FieldWhat goes in itRequired
Reported faultWhat the customer says happened, in their words. Quote it.Yes
Visual conditionContamination, burn marks, impact damage, water, shaft condition, missing parts.Yes
Insulation resistance (megohm)Value, test voltage, duration, and ambient temperature. "Passed" is not a reading.Yes
Winding resistance per phaseAll three phases, so imbalance is visible on the record.Yes
Surge / hipot resultIf performed. Note the test voltage used.Optional
Mechanical checksShaft runout, bearing fits, endplay, rotor condition.Optional
Photos takenReference the photo IDs. Photos at intake end most "it wasn't like that" arguments.Optional

4. Authorized scope & approval

Two separate approvals. Inspection first, repair second, because the repair cannot be priced until the core is open.

FieldWhat goes in itRequired
Teardown & inspect authorizedDollar limit and who approved it, with date. This is the only work permitted before the repair quote.Yes
Repair scope quotedThe line items you priced: rewind, bearings, machining, balance, paint, testing.Yes
Not-to-exceed amountThe ceiling. Work beyond it needs a fresh approval line, not a phone call nobody wrote down.Yes
Approved by / date / methodName, date, and how, email, PO, verbal. Verbal approvals need a second initial.Yes
Scrap / return decisionIf the motor is uneconomical, what the customer wants done with the core.Optional

5. Work performed

Filled in on the floor as the job moves, not reconstructed at the end of the week.

FieldWhat goes in itRequired
OperationStrip, burnout, rewind, VPI/dip-and-bake, machining, bearing fit, balance, assembly, paint.Yes
TechnicianWho did it. Needed for both quality trace and labor costing.Yes
Date & hoursHours by operation, not one lump at the end. This is where your real job cost lives.Yes
Coil / winding dataTurns, wire size, connection, slot count, pitch. Record it, the next rewind of this motor depends on it.Optional
Outside servicesVendor, what they did, their cost, and their return date. Outside work is the top cause of blown lead times.Optional

6. Parts & materials

FieldWhat goes in itRequired
Part number & descriptionBearings, seals, wire, insulation, varnish, hardware.Yes
QuantityIssued to this job, so stock deducts correctly.Yes
Unit cost & extendedYour cost. Selling price belongs on the invoice, not on the floor copy.Optional
SourceShelf stock or purchased for this job, with the PO number if purchased.Optional

7. Final test & release

The customer is paying for a tested motor. Give them the numbers, not a checkmark.

FieldWhat goes in itRequired
Final insulation resistancePost-repair megohm value with test voltage and temperature.Yes
No-load run testAmps per phase, voltage, run time, vibration, bearing temperatures.Yes
Balance resultIf the rotor was balanced, the achieved grade or residual value.Optional
Warranty termsDuration and what it covers. Put it on the paperwork, not just in a folder.Yes
QA sign-offWho released the motor for shipment.Yes
Customer sign-offSignature on pickup or delivery note reference.Yes

Plain-text version

Paste this into Word, Google Docs, or a spreadsheet and print it. Nothing to download, no sign-up.

ELECTRIC MOTOR REPAIR, WORK ORDER

Job / WO No: ______________     Date received: ____________
Customer: _________________________________________________
Site / contact: ___________________________________________
Customer PO: ______________     Promised date: ____________
Priority:  [ ] Standard   [ ] Rush   [ ] Emergency

--- MOTOR NAMEPLATE ----------------------------------------
Manufacturer: _____________     Model: ____________________
Serial: ___________________     HP / kW: __________________
Volts: ____________  Amps: ____________  Phase: ____  Hz: ___
RPM: ______  Poles: ______  Frame: ______  Mount: __________
Enclosure: ________  Ins. class: ______  Service factor: ____
Bearing DE: _______________     Bearing ODE: _______________
Accessories: ______________________________________________

--- INCOMING INSPECTION ------------------------------------
Reported fault: ___________________________________________
Visual condition: _________________________________________
Insulation resistance: ________ Mohm @ ______ V, ______ degC
Winding resistance:  U ________  V ________  W ________ ohm
Surge / hipot: ____________________________________________
Mechanical (runout / endplay / fits): _____________________
Photos taken: [ ] Yes   IDs: _____________________________

--- AUTHORIZATION ------------------------------------------
Teardown & inspect authorized to $____________
   Approved by: ______________ Date: ______ Method: ________
Repair scope quoted: ______________________________________
NOT TO EXCEED: $____________
   Approved by: ______________ Date: ______ Method: ________
If uneconomical:  [ ] Scrap   [ ] Return core   [ ] Hold

--- WORK PERFORMED -----------------------------------------
Operation            Technician      Date        Hours
__________________   ____________    ________    ______
__________________   ____________    ________    ______
__________________   ____________    ________    ______
Coil data (turns / wire / connection / pitch): ____________
Outside service:  Vendor __________  Cost $______  Due ____

--- PARTS & MATERIALS --------------------------------------
Part no.        Description        Qty     Cost    Source
____________    _______________    ____    _____   _______
____________    _______________    ____    _____   _______

--- FINAL TEST & RELEASE -----------------------------------
Final insulation resistance: ______ Mohm @ ______ V
No-load run:  U ______ V ______ W ______ A   Time: ________
Vibration: __________   Bearing temp: __________
Balance grade achieved: __________
Warranty: ______ months, covering __________________________
QA released by: ______________________  Date: _____________
Customer sign-off: ___________________  Date: _____________

The three fields shops leave blank, and what it costs them

Serial number. Skipped constantly, because at intake the motor is filthy and the plate is hard to read. It is also the only thing that proves the frame you shipped back is the frame that arrived. Shops that record it stop having annual arguments with large plants about swapped cores.

Incoming insulation resistance, as a number.Writing “failed” or “low” tells you nothing six months later when the customer claims the motor was fine when they sent it. A recorded 0.4 Mohm at 500 V and 22 °C is evidence. It also gives you a before-and-after pair to hand back with the invoice, which is the cheapest trust-builder in the business.

Not-to-exceed amount with an approver name.Verbal “yeah, go ahead” is where margin dies. When a job runs long and the plant refuses the overage, the only thing that settles it is a dollar ceiling with a name and a date next to it.

Where a paper template stops working

A printed template is genuinely the right tool for a two-bench shop. It stops working at the point where the same data is being written three times: once on the quote, again on the work order, and a third time on the invoice. That is where transcription errors enter, and it is why the parts on the shelf never quite match the parts on the job.

The fix is not a better form. It is generating the work order from the approved quote so nameplate data and line items carry through, and having the floor update status against the same job number the office is looking at. That is what work order software for motor repair shops does, and the wider shop management system covers quoting, inventory, and billing on the same job record. Keep using the template until the retyping is the bottleneck, that is the honest signal to switch.

Frequently asked questions

What should a motor repair work order include?
At minimum: job number, customer and PO, full motor nameplate data, incoming test readings, the authorized scope with a dollar limit, parts and materials used, labor hours by technician, final test results, and a customer sign-off line. The nameplate block and the incoming readings are what separate a motor repair work order from a generic repair order, without them you cannot prove what condition the motor arrived in.
What is the difference between a work order and a job card?
A work order authorizes the work and carries the commercial terms, scope, approval limit, customer PO. A job card travels with the motor through the shop and records what each department actually did. Small shops often combine them into one printed sheet; larger shops keep the work order at the counter and the job card on the bench.
Do I need a signed work order before starting a rewind?
You want written authorization with a dollar limit before any teardown that cannot be reversed. Disassembly and inspection are usually quoted as a separate, smaller authorization, because you cannot price the rewind until the core is stripped and tested. The template below splits those into two approval lines for that reason.
Is this work order template free?
Yes. Copy the plain-text version and use it however you like, there is no download gate and no sign-up. If retyping it onto paper for every job becomes the bottleneck, that is the point at which shops move to work order software instead.